Atian

VERTICALS

One binary. A different
record out of each.

A vertical is not a product. It is a prompt pack, a registry entry, a renderer and a credentialed reviewer — running on the same container, on the same hardware, against the same canonical record.

EMS
FIRE
YARD & TERMINAL
MINING
WHAT A VERTICAL COSTS US

Four things, and none of them are in the core.

A prompt pack

What to look for and what it means in this domain.

A registry entity

No open places, custom endpoint types, signal modalities.

A renderer

The mapping from canonical record to the format the industry files.

A reviewer

Someone credentialed in that domain who signs off on ground truth.

Everything else — capture, time alignment, edge reasoning, the evidence chain, egress policy — is identical across verticals. That is why the second one is not priced like the first.

VERTICAL IN ACTION

Emergency medical services

Where we started, because every job produces a billable claim. The record has value from the day it is created, rather than only at audit.

The record: NEMSIS, the federally standardised patient care report.

Simulated run — the record assembles as the event is delivered, the reviewer approves, and the completed return exports to the existing system.

83% of improper payments on ambulance claims trace to documentation failures. Incorrect coding accounts for 0.3%.

CMS, 2024

VERTICAL IN ACTION

Fire and rescue

Not a second market: the same vertical, in the same account, with a second output schema on vehicles already deployed.

The record: NFIRS, moving to NERIS.

Simulated run — the record assembles as the event is delivered, the reviewer approves, and the completed return exports to the existing system.

Incident data is fragmented across systems. Radio, video and telemetry must align before the full timeline can be reviewed.

Next — utilities, mining, electricity and gas.

The same container on bucket trucks and service vehicles that already carry a cellular router. One gateway fleet, two regulators, a second prompt pack.

The record, electric: a documented job briefing before every job — the first document an inspector asks for after an incident.

The record, gas: operator qualification and leak survey logs, per task and per mile.

ON THE ROADMAP

Mining, ports and terminals

Terminal tractors, haul trucks and support vehicles. Both score against the same entry screen we apply everywhere.

i

The same screen also tells us where not to go. Law enforcement fits and is already owned. Trucking fits and is already owned. Construction fits, and the buyer will not pay for it.